Project workflow

How a project moves through Solar Nest, stage by stage. SLA days below reflect Solar Nest Demo’s configured timelines.

Main ops trackParallel long-leadHOAKicks off immediately30+ day turnaround typicalSubmit application →wait → approved + docs inGate: approved = true ANDdocuments_submitted = trueSLA: 20 daysScrubAll required fields completeOwner: Rachael HansenRachael HansenRHSLA: 2 daysSite surveyPhotos + installableOwner: Rachael HansenRachael HansenRHSLA: 4 daysEngineeringPlans uploaded + approvedOwner: Brandon ScottBrandon ScottBSSLA: 3 daysSOWOps + rep both approveOwner: Rachael HansenRachael HansenRHSLA: 2 daysSplit: permit + ICA run in parallelPermittingPermit issuedOwner: Jessica AndrewsJessica AndrewsJASLA: 10 daysICAica_approved_date setOwner: Jessica AndrewsJessica AndrewsJASLA: 10 daysJoin: all three completePre-install reviewAll 5 checks passOwner: Rachael HansenRachael HansenRHSLA: 1 dayInstallationWork order approvedOwner: Jose RoldanJose RoldanJRSLA: 5 daysInspection → PTO → Fundingpto_approved_date + M1/M2/M3Owner: Jose RoldanJose RoldanJRSLA: 5 daysCloseout → CompleteSystem operational + outreachOwner: Rachael HansenRachael HansenRHSLA: 2 days

Stage breakdown

Click any stage for the list of what happens there, the exact condition that advances the project, and how its timeline relates to other stages.

SLA values are pulled from Solar Nest Demo’s org_stage_slas configuration. Admins can adjust them in org settings.
Team Chat